Booking site starts for August now — send your plans this week for a locked-in EOFY rate. Get a quote →
R-05 · CREW BASED SILVERWATER

Hills District Excavation, Demolition & Land Clearing Experts

Acreage clears, big cuts and new-estate slabs from Castle Hill to Kenthurst. Clay country — where compaction certificates aren’t optional.

LOCAL SITE NOTES
Reactive clay is the story of the Hills — it swells wet and shrinks dry, so compaction and drainage matter more here than anywhere. Acreage blocks in Dural and Kenthurst mean bigger clears and longer haul distances; we price those flat, not hourly.
Hills District, Sydney
SUBURBS WE COVER
Castle HillBaulkham HillsKellyvilleRouse HillDuralGlenhavenBella VistaKenthurst+ surrounding suburbs

All nine services, available in the Hills

All services →

Why Ouss Civil in Hills District

Hills clay is reactive — it swells wet, shrinks dry and moves slabs built on fill nobody compacted properly. Out here, compaction certificates and drainage design aren’t box-ticking; they’re the difference between a slab that sits still and one that doesn’t.

We compact in tested layers with certificates your engineer signs, shape falls so stormwater leaves the clay alone, and price acreage clears in Dural and Kenthurst flat rather than hourly — long haul distances are our problem to manage, not your surprise.

Layered compaction with test certificates — built for reactive clay, signed off by engineersGPS-guided 20T Komatsu for the big acreage cuts from Castle Hill to Kenthurst$20M public liability and SafeWork SWMS — big machines run by the bookFlat pricing on acreage jobs — haul distance is priced in, not billed by the hour
OUSS Civil crew on site in Dural with heavy excavation equipment, providing expert civil construction, excavation, earthworks, site preparation, and infrastructure services.
LOCAL JOB — P-121

Dural: 68 metres of engineered wall on clay that eats cheap ones.

The old timber wall lasted nine years. The replacement is engineered for fifty — cut, drained, piered and certified in 14 days.

Read the case study →
Dural: 68 metres of engineered wall on clay that eats cheap ones.

Hills District FAQs

Usually within the week for standard jobs — the Silverwater-based crew covers this region daily, so there’s no mobilisation premium.

Tell us about the job.

Price back within 24 hours — or we’ll tell you straight if it’s not our kind of work.